Workbench TWO – Day 24

Objectives for today are trimming the drawbore peg, drilling pre-drill holes for lag screws and sizing, cutting tenons and fitting the long rails. Trimming the drawbore  pegs was a first for me.   I used the Veritas Flush-Cutting saw.  The cut was amazing.   A little experimentation to hold the saw very flat and I […]

Workbench TWO – Day 23

The objective today is to get the short rails and corresponding legs completed and assembled. Some finishing steps were required on the short rails to have them ready for glue up and draw boarded. Drilled all the holes in the top short rails that will allow the 3/8″ x 5 1/2″ lag bolts to be […]

Workbench TWO – Day 22

Objective today is complete the short rails mortise and tenons for for 2nd set of legs.   Start installation of twin vise including cutting clearance in upper rail,  sizing and initial fitting of backer boards for twin vise. Completing the remaining mortise and tenons for the short rails was straight forward.  Learned a lot on […]