Workbench TWO – Day 28

The objective today is the bottom shelf. As the bottoms rails were milled, a 3/8″ dado was cut in each.   I had also milled up the shelf supports several days before.  So all was ready to start the install and shelf milling process.  I also setup a 2nd work table in my “finishing” area. […]

Workbench TWO – Day 24

Objectives for today are trimming the drawbore peg, drilling pre-drill holes for lag screws and sizing, cutting tenons and fitting the long rails. Trimming the drawbore  pegs was a first for me.   I used the Veritas Flush-Cutting saw.  The cut was amazing.   A little experimentation to hold the saw very flat and I […]