Workbench TWO – Day 30

As I said in the last post, this “Day” is really a group of days working on one of tasks to get the bench completed.  This is all about the square bench dogs. As I have pointed out in several previous posts, I am following the excellent BenchCrafted Split Roubo plan.   The square bench […]

Workbench TWO – Day 27

The objective today was to fix the problem on the tail vise mounting stock. I realized yesterday as I was writing the notes for Day 26 pictures there was a problem with the mounting bolts for the tail vise stock.  The sliding nut assemblies were engineered as two aluminum pieces so the bolt could move […]

Workbench TWO – Day 9

The objective for today is routing out the tail vise slot and complete the glue up of the forth section of the top.  That will be the last section. Built a jig to allow routing the template slot.  This is being done on the side of the top piece.  It uses the same router setups […]