Workbench TWO – Day 23

The objective today is to get the short rails and corresponding legs completed and assembled. Some finishing steps were required on the short rails to have them ready for glue up and draw boarded. Drilled all the holes in the top short rails that will allow the 3/8″ x 5 1/2″ lag bolts to be […]